New equipment for nuclear safeguards at Sellafield reprocessing plant

logo

A new mass spectrometer was inaugurated on the 25 of July in the nuclear reprocessing plant of Sellafield, in the United Kingdom. The "on-site" laboratories located in Sellafield are managed by the JRC’s Institute for Transuranium Elements (ITU) and were set up to comply with the European Commission’s safeguards obligations under the Euratom treaty. This plant process several hundreds of tons of nuclear material in a year, calling therefore for a stringent system of safeguards measures. This new equipment brings the laboratories to the highest, state of the art standard and assures the good continuity of the safeguards activities in the future.

Go to Source

Share and Enjoy:
  • Add to favorites
  • email
  • Print
  • Twitter
  • Facebook
  • Digg
  • StumbleUpon
  • del.icio.us
  • Yahoo! Buzz
  • Google Bookmarks
  • Google Buzz
  • FriendFeed
  • LinkedIn
  • Live
  • Posterous
  • Reddit
  • Technorati
  • Wikio

Comments are closed.

Leave a Reply

You must be logged in to post a comment.

MySQL query error